Sites Large or Small, We Have You Covered.

Project Highlights

Project: Br. No-H-12-039 Over Merrimack River, Haverhill MA

General Contractor: SPS New England

Project Completion Date: Ongoing

Project: Lafayette Bridge, North Kingston RI

General Contractor: RIDOT & J.H Lynch & Sons

Project Completion Date: Ongoing

Project: East Shore Expressway

Location: East Providence, RI

General Contractor: Manafort Construction

Project Completion Date: November 2016

East Shore Expressway Bridge No.475, which was a RIDOT Accelerated Bridge Construction project.  This 10,000 SF, 220’ long  bridge consisting of  concrete deck,  arches and substructure totaling over 1,000 cubic yards of concrete was demolished while new abutments were installed and protected  prior to demo was demolished and removed in 20 hours.  A new superstructure was rolled into place after demolition.

Intel

Location: Hudson, Massachusetts

General Contractor: MWH

Project Completion Date: October 2018

Decommissioned and demolished 930,000 square feet of site consisting of Fab 17 Building, Central Utility Building, Stone Building, Chem/Gas Building, Well Water Treatment Building, Guard Shack and Mod 4 Foundation, located at 75 Reed Road in Hudson, MA.  Project consisted of six phases: (1) planning, (2) building isolation, (3) hazardous materials/hazardous waste removal, (4) asset evaluation and recovery, (5) building demolition, and (6) Site restoration.  Project was completed on time, under budget, and met the projects goal to divert 90 percent of all material from landfills.

Project: Redbud, Site Phase II

Location: North Kingstown, RI

Construction Manager: The Dennis Group

Project Completion Date: December, 2019

Scope: The site work associated with this phase of the project has included furnish and install of sewer, water, and drain utilities, including both underground drainage systems and detention ponds. There is a significant amount of drilling, blasting, and crushing of ledge associated with this project, which has provided the required fill material for all trade contractors with minimal required import of material to the jobsite. We have also provided excavation and backfill work for the building foundations and site electric work. The conclusion of our scope will include final curb, sidewalks, paving, and landscape work.

Location: Dighton, MA

Construction Manager: Gilbane Building Company

Project Completion Date: November, 2021

Scope: This project utilized resources from our other land clearing and demolition divisions- first needing to clear a few acres of property and then to demolish an existing house and garage before the commencement of excavation. Site work associated with this project includes cut and fill of the site to sub grade, foundation excavation and back fill, installation of sewer, water and drain systems, including several underground detention systems and treatment structures, and digging and back filling for other utilities on the project. Finish work on the project will include curbing installation and paving of the school roads and parking lots. This is a multi-phase project requiring coordination with school activities and areas being utilized by faculty and students during construction.

Additional Key Projects

Site Development, Quonset RI.

Land Clearing, Hopkinton MA.

Mathworks Demolition, Natick MA

Commonwealth Ave Bridge Repair, Boston MA